Topic
offshore wind
Every Plug & Go High Voltage article tagged offshore wind, gathered in one place for procurement and engineering teams researching this topic.
Articles in this topic
- 132kV Array Systems: What the Next Voltage Step Asks of Dropper Cables
What the Hi-VAS work concluded about 132kV array systems, where the qualification gaps sit, and what doubling voltage again asks of the turbine connection.
- Siemens Energy and Siemens Gamesa Are Becoming Omterra
Siemens Energy's move to unify with Siemens Gamesa under Omterra is a naming change, not an engineering one — here's what procurement teams should verify.
- Inspecting and Replacing Offshore Wind Dropper Cables
Dropper cables fail quietly until they don't. How to spot jacket abrasion and torsional fatigue early, and why pre-terminated kits speed replacement.
- 66kV vs. 33kV Offshore Array Cables: Why Voltage Class Matters
Why most offshore wind projects now specify 66kV inter-array cables, what it changes about dropper cable and connector design, and what to check first.
- What Is a Dropper Cable? Why Offshore Wind Uses Them
A practical look at preassembled dropper cable systems, why the industry moved away from field jointing, and what to ask suppliers about.